An Oldham firm has been fined £30,000 by the HSE after a 25-year-old bricklayer sustained serious injuries from falling through a collapsing roof.
An Oldham-based construction firm has been fined £30,000 following a Health and Safety Executive (HSE) investigation into a serious incident that left a 25-year-old bricklayer hospitalised for a month. The worker sustained multiple severe injuries, including fractures to his right leg, hip, and left hand, after falling through a collapsing roof structure on site.
The HSE inquiry revealed systematic failings in safety protocols, finding that the contractor failed to properly plan, manage, and monitor work at height. Inspectors noted that suitable risk assessments had not been executed and basic preventative measures—such as netting, scaffolding, or fall-arrest harnesses—were lacking during the works.
Working at height remains the single largest cause of workplace fatalities and major injuries in the UK construction industry. The financial penalty handed down in this case reflects the judiciary's strict approach to site management failures, particularly where basic risk mitigation could easily have prevented a life-changing incident.
For main contractors and sub-contractors alike, the ruling underscores the HSE's refusal to tolerate standard safety oversights. It serves as a reminder that responsibility for structural integrity and edge protection falls squarely on the site management prior to allowing trades onto vulnerable structures.
For independent tradespeople and sub-contractors working on residential or commercial sites, this ruling highlights the immediate need to audit personal protective equipment (PPE) and access kit before stepping onto any roof or timber structure. Trades should not rely solely on a site management's word regarding safety measures. When working at height, budget for certified fall-arrest equipment, access towers, or restraint lanyards available through merchants like Screwfix, Toolstation, or Travis Perkins. Spending £50 to £150 on rated harnesses and anchorage equipment, or ensuring proper scaffold decking is installed, is negligible compared to the physical and financial ruin of a site fall. If a structure appears unstable or lacks basic edge protection, work must stop until proper kit is on site.
Never start work on fragile or unverified roof structures without documented risk assessments and verified edge protection or fall-arrest systems in place.
Reported by HSE — original article
Price alerts on the kit you're watching, plus the deals our team files each day.
Create a free account